Project:
|
S0502: Technical guide for embedded generator
connection requests (Stage 1)
|
|
Deliverable:
|
Hypertext technical guide - Ver 1.2
|
|
|
|
|
Project:
|
S0504: Loss of mains protection for small
generators (Stage 1)
|
|
Deliverable:
|
Report on "Settings for loss of mains protection"
|
|
|
|
|
Project:
|
S0504: Loss of mains protection for small
generators (Stage 2)
|
|
Deliverable:
|
Model requirement specification
|
|
|
|
|
Project:
|
S0506: Technical criteria for electrical
integration of PVs (DTI/IEA Task 5)
|
|
Deliverable:
|
Workshop on "Grid interconnection of PV
systems"
|
|
Deliverable:
|
Technical guidelines for inverter connected
single phase generators up to 5kVA
|
|
|
|
|
Project:
|
S0507: Generating machines database to support
connection design
|
|
Deliverable:
|
Fully implemented database
|
|
|
|
|
Project:
|
S0508: Photovoltaic Power Systems (DTI/IEA
Task 1)
|
|
Deliverable:
|
International survey report & executive
summary
|
|
Deliverable:
|
PV Power newsletter
|
|
Deliverable:
|
IEA Photo Voltaic Power Systems (PVPS) annual
report
|
|
Deliverable:
|
Report on R&D status and national strategies
in IEA countries
|
|
Deliverable:
|
Report on buyback rates for grid connected systems
|
|
Deliverable:
|
Workshop on "Environmental aspects of PV"
|
|
Deliverable:
|
Workshop on "PV in a competitive energy
market"
|
|
|
|
|
Project:
|
S0511: SFCL
|
|
Deliverable:
|
Specification and design of prototype superconducting
fault current limiter.
|
|
|
|
|
Project:
|
S0512: Earthing and embedded generation
|
|
Deliverable:
|
Summary report encompassing main aspects of
work/investigation
|
|
Deliverable:
|
Report on high frequency transient aspects of
earthing systems
|
|
|
|
|
Project
|
S0513: Single phase connection at LV for
generators (Stage 1)
|
|
Deliverable:
|
Report on "Small scale embedded generation:
literature survey"
|
|
|
|
|
Project
|
S0513: Single phase connection at LV for
generators (Stage 2)
|
|
Deliverable:
|
Workshop to define stage 3 model
|
|
|
|
|
Project
|
S0513: Single phase connection at LV for
generators (Stage 3)
|
|
Deliverable:
|
Report on model findings from scenarios
|
|
Project:
|
S0502: Technical guide for embedded generator
connection requests (Stage 2)
|
|
Deliverable:
|
Working group meeting notes, Proposal for Guide
revisions [GUIDE 2]
|
|
|
|
|
Project:
|
S0502: Technical guide for embedded generator
connection requests (Stage 3)
|
|
Deliverable:
|
Updated version of Guide in Acrobat format
|
|
|
|
|
Project:
|
S0504: Loss of mains protection for small
generators (Stage 3)
|
|
Deliverable:
|
Report on model capabilities
|
|
|
|
|
Project:
|
S0504: Loss of mains protection for small
generators (Stage 4)
|
|
Deliverable:
|
Report on modeling LOM scenarios
|
|
|
|
|
Project:
|
S0506: Technical criteria for electrical
integration of PVs (DTI/IEA Task 5)
|
|
Deliverable:
|
Guidelines and reference materials for application
of grid connected PV systems in the UK
|
|
|
|
|
Project
|
S0513: Single phase connection at LV for
generators (Stage 4)
|
|
Deliverable:
|
Proposal defining the Stage 5 network model
|
|
|
|
|
Project
|
S0513: Single phase connection at LV for
generators (Stage 5)
|
|
Deliverable:
|
Report on Model findings
|
|
|
|
|
Project
|
S0515: Increasing levels of embedded generation
.....
|
|
Deliverable:
|
Interim report
|
|
Deliverable:
|
Final Report
|
|
|
|
|
Project
|
S0517: CHP and high efficiency embedded generation
media - emerging trends and opportunities, post
Kyoto
|
|
Deliverable:
|
Report, with recommendations
|
|
|
|
|
Project
|
S0520: Software to asses the impact of embedded
generation upon the distribution network (Stage
1)
|
|
Deliverable:
|
Short Report tabulating current usage, capabilities
and unfulfilled needs
|
|
|
|
|
|
Project
|
S0520: Software to asses the impact of embedded
generation upon the distribution network (Stage
2)
|
|
Deliverable:
|
User Requirement and Software Design Specifications
|
|
|
|
|
Project
|
S0522: Voltage control and Embedded Generation
(Stage 1)
|
|
Deliverable:
|
A report describing the available AVC relays,
their characteristics and recommendations
for critical criteria
|
|
|
|
|
Project
|
S0522: Voltage control and Embedded Generation
(Stage 2)
|
|
Deliverable:
|
Stage 3 proposal
|
|
|
|
|
Project
|
S0522: Voltage control and Embedded Generation
(Stage 3)
|
|
Deliverable:
|
A report on findings - Due for completion at
year end (Financial year)
|
|
|
|
|
Project
|
S0525: Transformer saturating effect of DC
from Embedded Generation (Stage 1)
|
|
Deliverable:
|
Summary of the current position and definition
of necessary following work
|
|
|
|
|
Project
|
S0525: Transformer saturating effect of DC
from Embedded Generation (Stage 2)
|
|
Deliverable:
|
Report on tests
|
|
|
|
|
Project
|
S0527: Earthing Measurements (Stage 1)
|
|
Deliverable:
|
Survey Report
|
|
|
|
|
Project
|
S0528: Electrical Energy Storage (Stage 1)
|
|
Deliverable:
|
Presentation at steering group meeting (6/5/98)
"Review of Electrical Energy Storage
Systems"
|
|
|
|
|
Project
|
S0530/S0027: Technical direction of the UK
PV Experimental Programme (Phase 2)
|
|
Deliverable:
|
Interim Report on Experimental Programme Results
|
|
|
|
|
Project
|
S0533: Mobile Generator Earthing
|
|
Deliverable:
|
A best practice type guide for simple integration
onto S0502 - Technical Guide
|
|
|
|
|
Project
|
S0537: Principles of witness testing for
Embedded Generation
|
|
Deliverable:
|
A guide which clarifies the testing and witnessing
requirements for G59 (to
include test methods and example results)
|
|
Project:
|
S0506 - Technical criteria for electrical
integration of photovoltaic systems into electricity
supply networks
|
|
Deliverable:
|
Publish connection guidelines
|
|
|
|
|
Project:
|
S0532: Generator Controller modeling
|
|
Deliverable:
|
Report on Stage 1 findings
|
|
|
|
|
Project:
|
S0533 - Mobile generator earthing
|
|
Deliverable:
|
A best practice type guide for simple integration
on to S0502 - Technical Guide
|
|
|
|
|
Project:
|
S0534/S0642: Duos tariffs and other charges
for Embedded Generation
|
|
Deliverable:
|
Report on the strengths and weaknesses of current
charging methods
|
|
Deliverable
|
Report on improved charging methods. Spreadsheet
for improved formulation of charges.
|
|
|
|
|
Project
|
S0537: Principles of witness testing for
Embedded Generation
|
|
Deliverable:
|
A guide which clarifies the testing and witnessing
requirements for G59 (to include test methods
and example results)
|
|
|
|
|
Project:
|
S0539: Effects of dc from embedded generation
upon RCD's and single phase metering
|
|
Deliverable:
|
Report on initial experimental work with RCDs
and information from manufacturers on other devices
|
|
|
|
|
Project:
|
S0540: Network monitoring for the identification
and clarification of generator loss of mains
protection operations
|
|
Deliverable:
|
Short report on Stage 2 findings, detailing
the setup and data obtained
|
|
|
|
|
Project:
|
S0541: Remote scheduling and management of
embedded generation
|
|
Deliverable:
|
Report on Stage 1 findings
|
|
|
|
|
Project:
|
S0542: Connection at LV of Mobile Generators
|
|
Deliverable:
|
Connection document, detailing REC Survey results
|
|
|
|
|
Project:
|
S0543: Obtaining benefits from the connection
of Embedded Generators
|
|
Deliverable:
|
A report detailing findings of the reliability
and availability analysis
|
|
|
|
|
Project:
|
S0544: Network applications of the Superconducting
Fault Current Limiter
|
|
Deliverable:
|
A report on the findings of the investigations
|
|
|
|
|
Project:
|
S0550: Embedded Generation Network
Design Concepts
|
|
Deliverable:
|
Summary report
|
|
|
|
|
Project:
|
S0552: Embedded Generation Growth Areas
|
|
Deliverable:
|
Report on "Embedded Generation Growth Areas
- A Watching Brief"
|
|
|
|
|
Project:
|
S0555: Module 5 co-ordination
|
|
Deliverable:
|
Meetings and monthly reports
|
|
|
|
|
Project:
|
S0557: Contribution from embedded generation
|
|
Deliverable:
|
Report on contribution from embedded generation
to security of supply as seen in P2/5 and ACE
report 51
|
|
|
|
|
Project:
|
S0558: Operating Distribution Networks
in Islanded Mode - the Issues
|
|
Deliverable:
|
Report on "Operating Distribution Networks in
Islanded Mode - the Issues"
|
|
|
|
|
Project:
|
S0560: New regulation, embedded generation
and its effect on distribution networks
|
|
Project:
|
S0532: Generator controller modelling
- Stage 3
|
|
Deliverable:
|
Short briefing document on the findings in Tasks
1 to 3
|
|
Deliverable
|
Project meeting to determine way forward
|
|
|
|
|
Project:
|
S0540: Network
monitoring for the identification and clarification
of generator loss of mains protection operations
- Stage 3 |
|
Deliverable:
|
Short report on Tasks 1 & 2
|
|
|
|
|
Project:
|
S0547: Ancillary services market for
distribution systems
|
|
Deliverable:
|
Report on the review and analysis of ancillary
services detailing their future application at
distribution level
|
|
Deliverable:
|
Report on Stage 2 findings (detailed investigations
into Distribution Ancillary Services)
|
|
|
|
|
Project:
|
S0550: Embedded generation network
design concepts - Stage 2
|
|
Deliverable:
|
Summary report
|
|
|
|
|
Project:
|
S0552: Watching brief on embedded generation
growth areas (Stage 2)
|
|
Deliverable:
|
Autumn briefing sheet (watching brief on embedded
generation)
|
|
Deliverable:
|
Autumn presentation (watching brief)
|
|
Deliverable:
|
Winter briefing sheet (watching brief on embedded
generation)
|
|
Deliverable:
|
Winter presentation (watching brief)
|
|
|
|
|
Project:
|
S0556: Modelling SFCLs in network
|
|
Deliverable:
|
|
|
|