EA Technology - Power Management Consultants Electrical Power Distribution and Energy Research
About Us Home Page Training Home Page Products Home Page Consultancy  Home Page Services Home Page Sectors Home Page STP Home Page Tech Forum Home Page      Contact Us Page
Energy Power Asset Management
   Search EA Technology
 

Summary of Work - STP Module 10:  Operating Networks

1999/2000

Summary of Year 1 (1999/2000) Deliverables

Project:

S1001 - Communications

Deliverable:

Best practice study

 

 

Project:

S1002 - Fault localisation

Deliverable:

Survey and gap analysis

 

 

Project:

S1003 - Review of distribution management systems

Deliverable:

Report surveying current international work

 

 

Project:

S1004 - Module 10 Administration 1999/2000

 

 

Project:

S1006 - Resource forecasting in/for emergencies

Deliverable:

Best practice study

 

 

Project:

S1008 - Pre-fault prediction

Deliverable:

Survey and gap analysis

2000/2001

Summary of Year 2 (2000/2001) Deliverables

Project:

S1001 (Stage 2) - Communications

Deliverable:

An outline specification for a condition based decision system and automatic fault dispatch

 

 

Project:

S1002 (Stage 2) - Fault localisation

Deliverable:

Matrix of options and benefits

 

 

Project:

S1008 (Stage 2) - Pre-fault prediction

Deliverable:

Business case for HV pre-fault prediction system

 

 

Project:

S1010 - Customer call handling during fault conditions

Deliverable:

A report on the findings of the surveys and the cost/benefit analysis

 

 

Project:

S1014 - Costs and benefits of alternative approaches to premise/network connectivity

Deliverable:

A report on the findings of the investigation and the cost/benefit analysis

 

 

Project:

S1015 - Alternative sources of supply for 18 hour restoration

Deliverable:

Matrix of technical options, costs and benefits

Deliverable:

Report on cost information on which to base decisions as to whether to provide alternative supplies to consumer groups

 

 

Project:

S1016 - Records management following fault repairs

Deliverable:

A report with process maps

2001/2002

Summary of Year 3 (2001/2002) Deliverables

Project:

S1002 - S1002 (Stage 3) - Fault localisation

Deliverable:

Report:  "Fault localisation - loss of supply notification partners" Stage 3

Deliverable:

Report:  "Fault localisation - specification for trial with collaborator" Final

 

 

Project:

S1008 (Stage 3) - Pre-fault prediction

Deliverable:

Report:  "Fault prediction - overhead lines"

Deliverable:

Report:  "Overhead line fault prediction:  Method selection and evaluation"

Deliverable:

Report - (Final):  "Overhead line fault predictor model"

 

 

Project:

S1020 - Status reports from field and NMS (network management systems)

Deliverable:

Report:  "The impact of automated information system implementation"

 

 

Project:

S1021 - Intermittent and repeat fault management

Deliverable:

Report:  "Intermittent and repeat fault management - best practice"

 

 

Project:

S1025 - Control and operation of embedded generation to reduce network operating costs

Deliverable:

Report:  "World survey of embedded generator support of the network in emergency"

 

 

Project:

S1027 - LV network control

Deliverable:

Report:  "LV network control"

 

 

 

 

 Updated 03.10 2002

 

 

 

Switchgear Transformer Failure Switchgear Transformer Failure
Switchgear Transformer Failure
 
 
 
Latest EA Technology News
Minister says innovation is vital as ‘age of cheap power is over’
Buy a practical guidance document on working with oil in HV switchgear
Innovation Fair will showcase bright ideas at £1.5m Energy Innovation Centre opening
EA Technology hosts ENARD Spring Meetings - Chester, UK, April 2008
 
EA Technology Electricity and Power News