Project:
|
S1001 - Communications
|
|
Deliverable:
|
Best practice study
|
|
|
|
|
Project:
|
S1002 - Fault localisation
|
|
Deliverable:
|
Survey and gap analysis
|
|
|
|
|
Project:
|
S1003 - Review of distribution management
systems
|
|
Deliverable:
|
Report surveying current international work
|
|
|
|
|
Project:
|
S1004 - Module 10 Administration 1999/2000
|
|
|
|
|
Project:
|
S1006 - Resource forecasting in/for emergencies
|
|
Deliverable:
|
Best practice study
|
|
|
|
|
Project:
|
S1008 - Pre-fault prediction
|
|
Deliverable:
|
Survey and gap analysis
|
|
Project:
|
S1001 (Stage 2) - Communications
|
|
Deliverable:
|
An outline specification for a condition based
decision system and automatic fault dispatch
|
|
|
|
|
Project:
|
S1002
(Stage 2) - Fault localisation |
|
Deliverable:
|
Matrix of options and benefits
|
|
|
|
|
Project:
|
S1008
(Stage 2) - Pre-fault prediction |
|
Deliverable:
|
Business case for HV pre-fault prediction system
|
|
|
|
|
Project:
|
S1010
- Customer call handling during fault conditions |
|
Deliverable:
|
A report on the findings of the surveys and
the cost/benefit analysis
|
|
|
|
|
Project:
|
S1014 - Costs and benefits of alternative
approaches to premise/network connectivity
|
|
Deliverable:
|
A report on the findings of the investigation
and the cost/benefit analysis
|
|
|
|
|
Project:
|
S1015 - Alternative sources of supply for
18 hour restoration
|
|
Deliverable:
|
Matrix of technical options, costs and benefits
|
|
Deliverable:
|
Report on cost information on which to base
decisions as to whether to provide alternative
supplies to consumer groups
|
|
|
|
|
Project:
|
S1016 - Records management following fault
repairs
|
|
Deliverable:
|
A report with process maps
|
|
Project:
|
S1002 - S1002 (Stage 3) - Fault localisation
|
|
Deliverable:
|
Report: "Fault localisation - loss of supply
notification partners" Stage 3
|
|
Deliverable:
|
Report: "Fault localisation - specification
for trial with collaborator" Final
|
|
|
|
|
Project:
|
S1008
(Stage 3) - Pre-fault prediction |
|
Deliverable:
|
Report: "Fault prediction - overhead lines"
|
|
Deliverable:
|
Report: "Overhead line fault prediction:
Method selection and evaluation"
|
|
Deliverable:
|
Report - (Final): "Overhead line fault predictor
model"
|
|
|
|
|
Project:
|
S1020 - Status reports from field and NMS
(network management systems)
|
|
Deliverable:
|
Report: "The impact of automated information
system implementation"
|
|
|
|
|
Project:
|
S1021 - Intermittent and repeat fault management
|
|
Deliverable:
|
Report: "Intermittent and repeat fault management
- best practice"
|
|
|
|
|
Project:
|
S1025 - Control and operation of embedded
generation to reduce network operating costs
|
|
Deliverable:
|
Report: "World survey of embedded generator
support of the network in emergency"
|
|
|
|
|
Project:
|
S1027 - LV network control
|
|
Deliverable:
|
Report: "LV network control"
|
|
|
|
|
|
|