Project:
|
S0601 - Identifying network demands for
small commercial and industrial sectors
|
|
Deliverable:
|
Report on extended network analysis methodology
|
|
Deliverable:
|
Software tool for network demand analysis
|
|
|
|
|
Project:
|
S0602 - Tools for investment appraisal
|
|
Deliverable:
|
Report on transferable applications from other
industries and case study on chosen example
|
|
Deliverable:
|
Report on existing software and its suitability
|
|
Deliverable:
|
Excel spreadsheet and user guide
|
|
|
|
|
Project:
|
S0604 - Multi criteria methods for financial
risk optimisation - Stages 1, 2, 3
|
|
Deliverable:
|
Review report on the up to date thinking and
applications of risk management and treatment
of uncertainty
|
|
Deliverable:
|
Scope for risk management for a distribution
business
|
|
Deliverable:
|
Case study report
|
|
|
|
|
Project:
|
S0605 - Increasing the capacity of stressed
networks
|
|
Deliverable:
|
Report to participating companies on the techniques
identified
|
|
|
|
|
Project:
|
S0607 - Cost allocation in distribution
monopolies
|
|
Deliverable:
|
Report on theoretical and practical procedures
for cost allocation in UK electricity distribution
|
|
Deliverable:
|
Report on the case study results, together
with principles and guidelines for cost allocation
on a large scale area of the distribution network
|
|
|
|
|
Project:
|
S0609 - Statistical analysis of domestic
energy consumption (PTP project)
|
|
Deliverable:
|
Quarterly report on development of time-based
model, 2nd year report, journal or conference
paper describing time-based model, with quarterly
report and quarterly report describing statistical
theory for time-based modelling
|
|
|
|
|
Project:
|
S0613 - Long term forecasting of network
loads
|
|
Deliverable:
|
Report on the different forecasting methods
and their effectiveness
|
|
Deliverable
|
Report on the recommended forecasting methodology
|
|
Deliverable:
|
software tool for long-term forecasting
|
|
|
|
|
Project:
|
S0614 - Risks and consequences of exceeding
network ratings
|
|
Deliverable:
|
Report on the concept and possibilities
|
|
|
|
|
Project
|
S0616 - Cost allocation methods
|
|
Deliverable:
|
Report with specification of the method and
spreadsheet model
|
|
Deliverable:
|
The cost allocation spreadsheet
|
|
Deliverable:
|
Report and generalised spreadsheet
|
|
Deliverable:
|
Report on the method of cost allocation to
geographical types and updated cost allocation
spreadsheet
|
|
|
|
|
Project:
|
S0620 - Programme dissemination
|
|
Deliverable:
|
Two seminars, one workshop, or one day's consultancy
up to the value of £3000 to four of the companies
in the STP
|
|
|
|
|
Project:
|
S0604 - Multi criteria methods for financial
risk optimisation - Stages 1, 2, 3
|
|
Deliverable:
|
Report on the software based methodology for
risk management and optimisation within the
distribution business
|
|
|
|
|
Project:
|
S0607 - Cost allocation in distribution
monopolies
|
|
Deliverable:
|
PhD thesis as required by UMIST
|
|
Deliverable:
|
Report to the sponsors on the implications
of the research for their business
|
|
|
|
|
Project:
|
S0609 - Statistical analysis of domestic
energy consumption (PTP project)
|
|
Deliverable:
|
Quarterly report, confidential report to Manweb
on analysis of their dataset and complete PhD
thesis
|
|
|
|
|
Project
|
S0626 - Module 6 Administration
|
|
Deliverable:
|
Efficient administration of the module
|
|
|
|
|
Project
|
S0629 - Overhead line loading based on weather
|
|
Deliverable:
|
Report on the feasibility of a rating method
based on local weather measurements or Met Office
predictions
|
|
Deliverable:
|
Proposals for field trial on an overhead line
|
|
|
|
|
Project:
|
S0631 - Exploring the value of new approaches
to engineering decision making
|
|
Deliverable:
|
A report on the new method applied to the chosen
case study.
|
|
|
|
|
Project
|
S0633 - On-line disaggregation of transformer
loads
|
|
Deliverable:
|
Initial off-line model for the disaggregation
of transformer profiles
|
|
Deliverable:
|
Report on barriers to wider use of eaSCAN
|
|
|
|
|
Project
|
S0635 - Increasing current load in cables
|
|
Deliverable:
|
Report on present loading of cables and principal
factors limiting an increase in rating
|
|
Deliverable:
|
Plan of work and final report on prospects
of using higher utilisation of distribution
cables - generally or circuit by circuit - risk
analysis vs cost benefit aspects in addition
to technical capability of cables
|
|
|
|
|
Project
|
S0636 - Review of cyclic loading models
|
|
Deliverable:
|
Short report
|
|
|
|
|
Project
|
S0637 - Use of distribution assets for radio/telephony
infrastructure
|
|
Deliverable:
|
Technical and operational feasibility report
|
|
|
|
|
Project
|
S0641 - Improved information on transformer
ageing
|
|
Deliverable:
|
Spreadsheet showing analysis and ageing rates
of selected transformers
|
|
Project:
|
S0607 - Cost allocation in distribution
monopolies
|
|
Deliverable:
|
Report on theoretical and practical procedures
for cost allocation in UK electricity distribution
|
|
Deliverable:
|
Report on the case study results, together
with principles and guidelines for cost allocation
on a large scale area of the distribution network
|
|
|
|
|
Project:
|
S0616 - Cost allocation methods
|
|
Deliverable:
|
Report on the method of cost allocation to
geographical types and updated cost allocation
spreadsheet
|
|
|
|
|
Project:
|
S0629 - Overhead line loading - Stage 3
|
|
Deliverable:
|
Report
|
|
|
|
|
Project:
|
S0642 - DUoS tariffs for embedded generation
- Stages 1 and 2
|
|
Deliverable:
|
Report
|
|
|
|
|
Project:
|
S0643 - Implementation of real options techniques
for network planning
|
|
Deliverable:
|
Report on practical implementation procedures
|
|
Deliverable:
|
Initial spreadsheet model for implementation
of real options techniques
|
|
|
|
|
Project:
|
S0648 - eaSCAN - Stage 1
|
|
Deliverable:
|
On-going support for eaSCAN
|
|
|
|
|
Project:
|
S0651 - Monitoring partial discharge activity
in transformers - Stage 1
|
|
Deliverable:
|
Report assessing the existing systems and specifying
the areas which require development if any
|
|
|
|
|
Project:
|
S0652 - Continuing rating of switchgear
|
|
Deliverable:
|
Report assessing past and present documentation
and testing regimes and how this affects the
overloading of switchgear
|
|
|
|
|
Project:
|
S0653 - Measurement of the temperature of
existing cables
|
|
Deliverable:
|
Report on methods to measure cable temperature
|
|
|
|
|
Project:
|
S0643 - Implementation of
real options techniques for network planning
(Stage 3)
|
|
Deliverable:
|
Finished, documented, computer program
|
|
|
|
|
Project:
|
S0629 - Overhead line loading based on weather
(Stage 4)
|
|
Deliverable:
|
Report on extended field trial
|
|
|
|
|
Project:
|
S0651 - Monitoring partial discharge activity
in transformers (Stage 2)
|
|
Deliverable:
|
Report assessing the advantages in installing
Hydrans to monitor transformer condition
|
|
|
|
|
Project:
|
S0654/S0561 - Establishing network risk
|
|
Deliverable:
|
A simple model and report outlining the methodology
|