Case Study: Effective use of Online Partial Discharge Test

Since December 2021, Dak Lak PC has used an Astute HV Monitor to test 22kV assemblies across fourteen 110kV substations, improving productivity.
Worker in orange coveralls and helmet adjusting equipment in a control room.

In December 2021, Dak Lak PC was equipped with an online partial discharge monitoring device (Astute HV Monitor) by EVNCPC.

With effective application in practice, significant improvement can be seen in labor productivity and technical management activities.

Till this date, Astute HV Monitor is used to test for PD in 22kV assemblies for fourteen 110kV substations. Through inspections, 2 cabinets with PD phenomenon were detected and promptly handled to ensure safe operation of the power grid.

Read on to learn more about how Dak Lak PC utilised the Astute HV Monitor…

Free Guide
The growing gap between energy awareness and demand

The whitepaper explores the growing gap between consumers’ efforts to reduce energy use and rising electricity demand, highlighting why smarter, more visible and flexible LV networks are essential as EVs, heat pumps and distributed energy resources accelerate electrification.

Download here
Consumer Energy Trends Whitepaper
Consumer Energy Trends whitepaper cover

Recent case studies

See how our solutions are empowering teams and transforming their networks to unlock capacity, prevent outages and direct investment.