Case Study: Effective use of Online Partial Discharge Test
)
In December 2021, Dak Lak PC was equipped with an online partial discharge monitoring device (Astute HV Monitor) by EVNCPC.
With effective application in practice, significant improvement can be seen in labor productivity and technical management activities.
Till this date, Astute HV Monitor is used to test for PD in 22kV assemblies for fourteen 110kV substations. Through inspections, 2 cabinets with PD phenomenon were detected and promptly handled to ensure safe operation of the power grid.
Read on to learn more about how Dak Lak PC utilised the Astute HV Monitor…
)
)
)
)
)