Case Study: So, You Have Found PD – What Next?

Your annual PD survey suggests a problem. What next? How to weigh consequence and risk, and pinpoint where the defect actually is before you act.
Technicians in safety gear inspecting electrical control panels in a substation.

So, you have carried out an annual partial discharge (PD) survey of your HV plant and the readings suggest you have a problem, what next?

That quickly becomes a matter of potential consequence and risk; but if you decide it is time to act, have you got all the available information on the actual location of the defect?

Free Guide
The growing gap between energy awareness and demand

The whitepaper explores the growing gap between consumers’ efforts to reduce energy use and rising electricity demand, highlighting why smarter, more visible and flexible LV networks are essential as EVs, heat pumps and distributed energy resources accelerate electrification.

Download here
Consumer Energy Trends Whitepaper
Consumer Energy Trends whitepaper cover

Recent case studies

See how our solutions are empowering teams and transforming their networks to unlock capacity, prevent outages and direct investment.