Downtime prevention for data centers
Trusted by network operators and infrastructure providers globally
Every data center carries electrical risk, but the stakes differ depending on your backup capacity. With limited redundancy, a hidden fault like partial discharge can become your next outage. If you're already highly resilient and contracted to near-total uptime, the risk isn't reliability, it's the cost of protecting it, and the bill when that redundancy is finally tested. Our monitoring gives every operator the same edge, real evidence of asset condition, so you act on genuine risk instead of guesswork.
How INEOS improved visibility of asset condition and caught developing electrical risks before they threatened critical power.
Partial discharge monitoring gave INEOS early warning of insulation faults across ageing switchgear, letting the team plan interventions on their own schedule rather than react to an unplanned outage.
The whitepaper explores the growing gap between consumers’ efforts to reduce energy use and rising electricity demand, highlighting why smarter, more visible and flexible LV networks are essential as EVs, heat pumps and distributed energy resources accelerate electrification.
Latest Insights
)
)
)
)

)