Automating new network connection requests from weeks to minutes
)
Automating new connection requests for consumer energy resources (CER) such as rooftop solar panels, home batteries, EV chargers to commercial EV charging stations could help electricity network companies to respond quicker to customer demand, reduce the need for engineering resources and deliver quotes more rapidly.
As Australian households install more CER and businesses look to electrify their operations, the volume of new connection requests that electricity network companies have to handle are growing. Customers want to understand whether capacity on the network is available, what their connection could cost and what options are available to suit their needs.
EA Technology provides the solution through ConnectStore, a platform that delivers reliable connection assessments, network designs and investment plans from electricity networks perspective.
Why network connection requests are becoming more complex
Australia’s love affair with rooftop solar and batteries continues to grow. According to the Clean Energy Council, a record 102,234 rooftop solar systems were installed in the second quarter of 2026 and over a quarter of a million households now have home batteries.
Along with the growth of CER, electrification is shifting the demand for electricity for distribution networks. EV charging, reverse cycle air conditioning to industrial electric heating and cooling are introducing new loads while the flow of energy from rooftop solar and batteries back to the grid is increasing.
For electricity networks, this creates two significant challenges - the capacity to assess new connection requests while determining where capacity within the network needs to be reinforced. This is because each customer request for a new connection whether it's for a home battery or EV charger is different; and requires an assessment that is appropriate for its location, capacity and impact on the grid.
How manual reviews of connection requests are causing delays
To assess individual connection requests, engineers need to check on the network’s capacity, develop a design for the connection, calculate the cost and provide a quote to the customer. Many of these steps need to be repeated to support individual connection applications and this increases the workloads of engineers.
With the cost involved to install a new CER or load, many customers would also want to consider their options before making a commitment. For example, a different location to connect to the network might deliver a more practical outcome or may reduce the connection cost significantly. The option to stage a new connection over a period of time might also reduce the upfront investment for households or businesses.
Having different options available might help customers to make a decision but this would extend the time needed to respond to individual requests.
How automating network connection requests would work
Electricity networks already have a treasure trove of data to assess connection requests. Whether its network data, design policies to pricing rules, engineers have all the information they need at their fingertips to assess connection.
ConnectStore brings together information from geographic information systems (GIS), asset registers, customer records and mapping systems to be used to reconstruct the low-voltage (LV) network from a substation to a customers’ premises.
This turns fragmented records from individual silos of information into useful answers about a network’s capabilities. Network data is combined, prepared once and used across three distinct EA Technology products to give connection, design and forecasting teams a consistent foundation for their work.
VisNet Connect is a web-based tool that allows engineers to assess and generate new connection requirements and quotes for customers. Electricity networks can also provide automated, self-service answers if desired. An optional medium-voltage (MV) network capability is also available should network operators need to extend their connection assessments beyond low-voltage (LV) networks.
VisNet Design helps engineers to design new networks or change existing designs for LV networks. Using the ConnectStore platform, engineers can build on the network information already prepared for Connect.
VisNet Forecast allows electricity networks to plan for future networks by combining the LV network model with CER and electrification forecasts to identify where and when constraints are likely to emerge. Engineers can produce costed and scenario-based investment plans to support revenue and asset management plans.
Preparing for a customer and network focused energy transition
With ConnectStore providing a shared network model, VisNet Connect, Design and Forecast help electricity networks address today’s connection requests while planning for tomorrow’s demand. EA Technology helps electricity networks to move eligible customer connection quotations from weeks to minutes.
To find out how new connection requests can be done seamlessly in your network, contact EA Technology.
)
)
)
)
)